i have master project file have linked 10 or sub-projects has been running nicely months track schemes , jobs (without need resources).
now want assign resources (work, not material or cost) jobs within master/sub-project set-up.
i have created brand new project file (resource pool), input of work resources, saved same location master project , shared pool master way of resoucrce pool > share resources.
all good, or thought.........
now, though, can't work out how assign resources resource pool jobs held within master/sub set up?!? do need open each sub-project file individually , share resource pool each of 10 sub's , assign within or there way assign resources having master project , resource pool open?
anyone able help, i'm sure i'm being bit stupid!
by way i'm using ms project 2010.
thanks.
bully of smeg --
you need connect each subproject shared resource pool file. allow assign resources in each of subprojects. hope helps.